SABA体育

Saba体育 - 您的专属电较量事主场
Saba体育 - 您的专属电较量事主场 Saba体育 - 您的专属电较量事主场

CLIMAVENETA

会员1
Saba体育 - 您的专属电较量事主场
Projects APPLICATION
? Location:Home>Projects
CLIMAVENETA

huairou hospitai phase II

Area:Beijing System Type: Construction Area: Application Type:Healthcare / Hospitals Cooling Capacity:6100kW Heating Capacity:

Project:

The second phase project of Huairou Hospital adopts 2 water-cooled magnetic levitation frequency conversion centrifugal chiller +1 full liquid water-cooled chiller as its cooling source equipment, with a total cooling load of 6100kW.

Installed Units:

2x TECS-W7504L-E 1x FOCSWATER2451E "

Solution:

Huairou Hospital Phase II project is a medical and health project. In order to meet the cooling load demand in the whole area of the hospital phase II project, 2 water-cooled magnetic levitation frequency conversion centrifugal chiller +1 full liquid water-cooled chiller are adopted to meet the use demand of users in different areas.

Certification:

版权-表套
Saba体育 - 您的专属电较量事主场

Projects

APPLICATION Saba体育 - 您的专属电较量事主场
Projects Saba体育 - 您的专属电较量事主场
Saba体育 - 您的专属电较量事主场

huairou hospitai phase II

Area:Beijing System Type: Construction Area: Application Type:Healthcare / Hospitals Cooling Capacity:6100kW Heating Capacity:

Project:

The second phase project of Huairou Hospital adopts 2 water-cooled magnetic levitation frequency conversion centrifugal chiller +1 full liquid water-cooled chiller as its cooling source equipment, with a total cooling load of 6100kW.

System Type:

Installed Units:

2x TECS-W7504L-E 1x FOCSWATER2451E "

Solution:

Huairou Hospital Phase II project is a medical and health project. In order to meet the cooling load demand in the whole area of the hospital phase II project, 2 water-cooled magnetic levitation frequency conversion centrifugal chiller +1 full liquid water-cooled chiller are adopted to meet the use demand of users in different areas.

Certification:

【网站地图】