SABA体育

Saba体育 - 您的专属电较量事主场
Saba体育 - 您的专属电较量事主场 Saba体育 - 您的专属电较量事主场

CLIMAVENETA

会员1
Saba体育 - 您的专属电较量事主场
Projects APPLICATION
? Location:Home>Projects
CLIMAVENETA

Suzhou Health School Phase II

Area:Jiangsu System Type: Construction Area: Application Type:School / University Cooling Capacity:3500kW Heating Capacity:3000kW

Project:

The end of the air conditioner adopts the fan coil fresh air ventilation machine combination air conditioning box.

Installed Units:

FCU*372 MFC*23 MAC*5

Solution:

The end of the air conditioner adopts the fan coil fresh air ventilation machine combination air conditioning box.

Certification:

版权-表套
Saba体育 - 您的专属电较量事主场

Projects

APPLICATION Saba体育 - 您的专属电较量事主场
Projects Saba体育 - 您的专属电较量事主场
Saba体育 - 您的专属电较量事主场

Suzhou Health School Phase II

Area:Jiangsu System Type: Construction Area: Application Type:School / University Cooling Capacity:3500kW Heating Capacity:3000kW

Project:

The end of the air conditioner adopts the fan coil fresh air ventilation machine combination air conditioning box.

System Type:

Installed Units:

FCU*372 MFC*23 MAC*5

Solution:

The end of the air conditioner adopts the fan coil fresh air ventilation machine combination air conditioning box.

Certification:

【网站地图】