SABA体育

Saba体育 - 您的专属电较量事主场
Saba体育 - 您的专属电较量事主场 Saba体育 - 您的专属电较量事主场

CLIMAVENETA

会员1
Saba体育 - 您的专属电较量事主场
Projects APPLICATION
? Location:Home>Projects
CLIMAVENETA

Haikou hongchenghu commercial plaza

Area:Hainan System Type: Construction Area: Application Type:Commercial Buildings Cooling Capacity:3500KW Heating Capacity:

Project:

Haikou hongchenghu commercial plaza project adopts air-cooled water chillers and water chillers, with a total cooling load of 3500KW.

Installed Units:

3 × CSRH3002-D 1 × AQS130M-N 2 × AQS130S-N

Solution:

This system uses air-cooled chillers and chillers, with 6 hosts, and conventional terminal equipment at the end.

Certification:

版权-表套
Saba体育 - 您的专属电较量事主场

Projects

APPLICATION Saba体育 - 您的专属电较量事主场
Projects Saba体育 - 您的专属电较量事主场
Saba体育 - 您的专属电较量事主场

Haikou hongchenghu commercial plaza

Area:Hainan System Type: Construction Area: Application Type:Commercial Buildings Cooling Capacity:3500KW Heating Capacity:

Project:

Haikou hongchenghu commercial plaza project adopts air-cooled water chillers and water chillers, with a total cooling load of 3500KW.

System Type:

Installed Units:

3 × CSRH3002-D 1 × AQS130M-N 2 × AQS130S-N

Solution:

This system uses air-cooled chillers and chillers, with 6 hosts, and conventional terminal equipment at the end.

Certification:

【网站地图】